PACK disassembly process

  • Remove the conductive copper plate: manually remove the conductive copper bar screws and remove the conductive copper bar
  • Remove the liquid cooling pipe: remove the liquid cooling pipe connector
  • Manual re-inspection: manual inspection and pinch accessories, manual confirmation of product information, and input the information to the next station to facilitate automation
  • Remove the fixing screws of the module: a six-axis robot with CCD removes the screws that fix the module
  • Manual inspection: reserve screw stations for manual removal of modules
  • Pry the module: check the safety of a single module, and pry each module (disconnect the glue)
  • Pry open the liquid cooling tube: manually pry open the bonding between the module and the liquid cooling tube
  • Hoisting module: manually hoist the battery module to the module transfer conveyor line
  • Hoisting PACK pallets: manually hoist the PACK box to the side to be transferred out
  • Empty tooling board reflow: empty tooling board reflows through the lower layer of the elevator

 

PACK dismantling drum line

 

 

 

Advisory Message

二维码
Guangya Smart Official WeChat
0769-8855 7180

Contact address: No. 2 Taihe Road, Hengli Village, Wangniudun Town, Dongguan (in the courtyard of Guohong Building)

Contact: Jun Fang

email:steve@lai-tech.com.cn

Contact information:+6582605806

Online message
Copyright © 2020Dongguan Guangya Intelligent Technology Co., Ltd. Technical Support:MiKe Network